Lockheed Martin Prepares First 5G.MIL® Payload for Orbit
First Regenerative Non-Terrestrial Network 5G Satellite Base Station Completes Final Demo Prior to Space Mission
December 1, 2023 -- Lockheed Martin recently announced that the company has completed a final demo of the first regenerative non-terrestrial network 5G Satellite Base Station. In 2024, in a self-funded mission, the company will launch this payload to orbit bringing 5G’s capabilities to the final frontier to prove its capability to connect the globe.
AccelerComm has been working with Lockheed Martin to help develop and integrate the regenerative 5G NTN HBS-Space system over the past 2 years. AccelerComm provided an advanced 5G NTN Layer 1 PHY solution, developed to support Lockheed Martin’s system requirements and space flight hardware specifications.
Commenting on the news, AccelerComm’s CEO Tom Cronk said:
"5G satellite communication promises to unlock a whole new world of services and applications for government organisations and individuals, and we are proud to have worked with Lockheed Martin and its partners on delivering this vision. A space-deployed, scalable 3GPP Release 17 compatible 5G gNodeB proves that 5G NTN communications is a reality. AccelerComm’s LEOphy delivers higher data rates with reduced power and has dedicated features to overcome the specific challenges of NTN channels. We look forward to continuing our partnership, and to further developing advanced 5G Layer 1 NTN solutions that deliver the robustness, latency, and throughput that are critical to the success of 5G in space."
Read the full article on our strategic collaboration with Lockheed Martin.
For further questions or would like to speak to our experts, please get in touch directly.
|
AccelerComm Limited Hot IP
Related News
- AccelerComm® announces 5G NR NTN Physical Layer Solution that delivers over 6Gbps, 128 beams and 4,096 user connections per chipset
- Accelercomm Launches LEOphy for Low-Earth Orbit 5G Satellites
- Real Wireless Research Shows One Third Reduction for Private Network Infrastructure Cost Using AccelerComm 5G physical layer IP solution
- AccelerComm Announces 5G IP with O-RAN Acceleration Abstraction Layer (AAL) Interface
- AccelerComm® Joins Open Compute Project Foundation Focusing on Evenstar Modular Open RAN Radio Unit Reference Design
Breaking News
- RISC-V International Promotes Andrea Gallo to CEO
- See the 2025 Best Edge AI Processor IP at the Embedded Vision Summit
- Andes Technology Showcases RISC-V AI Leadership at RISC-V Summit Europe 2025
- RISC-V Royalty-Driven Revenue to Exceed License Revenue by 2027
- Keysom Unveils Keysom Core Explorer V1.0
Most Popular
- RISC-V Royalty-Driven Revenue to Exceed License Revenue by 2027
- SiFive and Kinara Partner to Offer Bare Metal Access to RISC-V Vector Processors
- Imagination Announces E-Series: A New Era of On-Device AI and Graphics
- Siemens to accelerate customer time to market with advanced silicon IP through new Alphawave Semi partnership
- Cadence Unveils Millennium M2000 Supercomputer with NVIDIA Blackwell Systems to Transform AI-Driven Silicon, Systems and Drug Design
![]() |
E-mail This Article | ![]() |
![]() |
Printer-Friendly Page |